How to prepare a factory timesheet: example with shifts, overtime and leave days
How to prepare a factory timesheet: a sample table with shifts, overtime and leave days, a monthly timesheet summary and weekly check questions.
A factory timesheet is a monthly sheet that shows, on one row, each employee’s planned shift, actual clock-in and clock-out, overtime and leave days in shift-based production. To prepare it, you first publish the shift plan, then match actual punches, leave records and approved overtime against that plan; card swipe times alone are not enough.
Monday, 06:10: on the paint line the night shift is leaving and the morning shift is arriving. The line supervisor is trying to settle two questions with the list in hand. Which day does the shift that started Saturday at 22:00 belong to? Why does the operator who was on leave on Friday show as “absent”? On top of that, three people on the morning shift stayed two hours longer than planned; how many had approved overtime, and how many were just waiting at the machine? This is why timekeeping in a factory is harder than in an office. This article gives a sample timesheet for shift-based production and the steps for reading it correctly.
A factory timesheet is a monthly work sheet that shows, on a single row, each employee’s planned shift, actual clock-in and clock-out, overtime and leave days in a business running shift-based production.
Why is a factory timesheet different from an office timesheet?
- Shifts run into the next day. On a night shift, clock-in belongs to one day and clock-out to the next; without a rule, the same shift gets split across two days.
- The plan changes. Shift swaps, team moves and urgent production orders update the plan often; if the timesheet closes against the old plan, it will be wrong.
- Overtime is common. When orders peak, overtime rises line by line; who stayed, at what time and with which approval must be on record.
- There is more than one recording point. The turnstile, the line terminal and the shift supervisor’s list can show the same person at different times.
Factory timesheet example: one employee’s weekly table
The table below is fictional. It shows how Employee A’s plan, actual punches and other records turn into a timesheet code. “O2” is a sample code meaning two hours of approved overtime on that day.
| Day | Plan | Actual punches | Other record | Timesheet |
|---|---|---|---|---|
| Monday | Morning 06:00–14:00 | 05:58–14:04 | None | N |
| Tuesday | Morning 06:00–14:00 | 06:02–16:01 | Approved overtime request, 2 hours | N + O2 |
| Wednesday | Morning 06:00–14:00 | No punches | Approved annual leave | L |
| Thursday | Evening 14:00–22:00 | 13:55–22:03 | Shift change notified in advance | N |
| Friday | Night 22:00–06:00 | 21:57 – next day 06:05 | Recorded on the day the shift starts | N |
| Saturday | Weekly rest day | No punches | Friday night’s clock-out falls on this day | R |
Two points stand out in the table. No punches on Wednesday is not absence but approved leave; you can only make this distinction if the leave record is matched with the timesheet. Because Friday night’s clock-out falls on Saturday, Saturday may look “not worked”, but that morning’s punch is the end of the shift that belongs to Friday. Decide once, as a company rule, which day a night shift is recorded on; the common practice is the day the shift starts.
Monthly timesheet example: summary by line
Daily rows are too detailed for a manager. At month end, a summary table by line shows both the data going to accounting and the open issues at a glance. The figures below are fictional; the aim is to show the logic of the columns.
| Employee | Days worked | Leave days | Sick days | Approved overtime (hours) | Open exceptions |
|---|---|---|---|---|---|
| Employee A | 20 | 2 | 1 | 6 | 0 |
| Employee B | 22 | 0 | 0 | 10 | 1 |
| Employee C | 18 | 4 | 0 | 0 | 0 |
| Employee D | 19 | 1 | 2 | 4 | 2 |
The “Open exceptions” column is the real checkpoint for closing. Every non-zero value means that a late arrival, a missing clock-out or an unexplained absence is still waiting for an answer. The period should not be locked until this whole column is zero. Otherwise the figure that goes to payroll preparation becomes an estimate that will have to be corrected again next month.
How do you keep timesheets in a shift-based factory? Six steps
- Publish the plan at the start of the period. Without a daily, weekly or monthly shift plan, you cannot tell who was late or who left early.
- Collect actual punches in one place. Turnstile, terminal and manual entries should be merged under the same employee ID.
- Enter shift changes in the plan. If swaps and moves are not recorded, at month end anyone can say “I wasn’t there that day”.
- Link overtime to a request and an approval. Time spent outside the plan should be recorded as overtime if there is an approved request, and as an open exception if not.
- Enter leave and sick notes. Do not mark a day without punches as absent before matching it with leave records.
- Close weekly. Each line supervisor should close their own team’s exceptions every week, so nothing piles up at month end.
In a small factory there is no need to set up everything at once. Start by publishing the plan and comparing it with actual punches; even this single step makes the question “is the plan wrong or is the record missing?” visible. In the second stage, link overtime to requests and approvals; in the third, match leave records with the timesheet. Each stage prepares the ground for the next and gives employees time to adjust. It is also important to involve line supervisors from the start; even if they do not keep the records, they interpret the exception list with knowledge from the floor and know which record a correction should start from.
For line supervisors, these questions make a sufficient checklist during the weekly close: Is there a difference between the planned shift and the actual punches? Is the reason for the difference written down? Is every day without punches matched with a leave or sick record? Is there an overtime request for every period spent outside the plan? Is the night shift’s clock-out linked to the right day? A week that gets “yes” to these five questions brings no surprises at month end.
How do I show overtime and leave in a factory timesheet?
Defining in advance how each situation appears in the timesheet, and which record backs it up, stops arguments. The table below is a starting suggestion; adapt your policy to your own workflow.
| Situation | How should it appear in the timesheet? | Supporting record |
|---|---|---|
| Approved overtime | Normal day + overtime hours | Overtime request and approval record |
| Unapproved staying late | Normal day; the extra time is tracked as an open exception | Punch record and manager’s explanation |
| Annual leave | Leave day | Approved leave request |
| Sick day | Sick day | Medical certificate |
| Shift swap | Normal day according to the new shift | Updated plan and change notification |
| End of a night shift | Belongs to the day the shift started | Plan and clock-out punch |
Where do Excel and paper factory timesheets work, and where do they break down?
In a small, single-shift workshop, a paper list and Excel are often enough. With multiple shifts, problems snowball: the shift supervisor keeps their own list, HR pulls the turnstile report separately, leave stays in e-mail. Three different results come out for the same person, and at month end there is an argument over whose record counts. In Excel, formulas that split the night shift in two, columns that miss a swapped shift and cells that change quietly after the period is closed make this mess even less visible.
How do factory timesheets work with YazSis KurumsalPortal?
- Plan: Shift & Overtime Planning creates daily, weekly and monthly shifts, assigns the team, checks for conflicts, notifies changes and links overtime requests to approval.
- Actual: Time & Attendance Control merges punches on one screen, matches them with employees and sends late arrivals, early departures and absences for approval as exceptions.
- Leave: with Mobile Leave Management, employees create leave requests from their phone browser without installing an app; the request goes through manager and HR approval, and approved leave is entered in the calendar.
- Result: because attendance records are matched with leave records, leave days are separated from absences, and the timesheet is produced from this clean data.
If you want to see how the modules work together for a shift-based site, start with the KurumsalPortal page and look at the plan and attendance flow on the related module pages.
Frequently asked questions
How do you prepare a factory timesheet?
First the shift plan is published, actual clock-ins and clock-outs are matched with employees, leave and sick records are entered and overtime is checked against approved requests; once exceptions are closed, the period is approved.
Which columns should a factory timesheet example have?
At a minimum: employee, day, planned shift, actual clock-in and clock-out, approved overtime, leave or sick information and the timesheet code. These columns let you compare the plan with what actually happened.
Which day is a night shift recorded on?
This needs to be set once as a company rule. The common practice is to record it on the day the shift starts; that way the shift stays a single record even if the clock-out falls on the next day.
How does overtime show up in a factory timesheet?
If there is an approved overtime request, it is entered as overtime hours next to the normal day. Without a request and approval, the extra time is tracked as an open exception and closed with the manager’s explanation.
Is Excel enough for timesheets in a shift-based factory?
It can be enough in small, single-shift setups. With multiple shifts, swaps and overtime, errors increase when plan, punch and leave records sit in separate files; a system that brings them into the same record is more reliable.
More articles
Digital transformation in manufacturing: first steps with ERP, RFID and maintenance
Digital transformation in a factory is not a software choice; it is finding where data breaks. How to map the break points in stock, work orders, maintenance and subcontracting, and build a step-by-step roadmap with ERP and RFID.
November 9, 2026 · 8 min readIbraname (release), employment certificate and SGK exit notification deadlines in Turkey
What is an ibraname and when is it valid, what is an employment certificate, when is the SGK exit notification due and until when can a hiring notification be cancelled in Turkey? Rules from the official Turkish texts and an exit timeline.
November 9, 2026 · 9 min readStarting an e-commerce website in Turkey: checklist, documents, legal texts and costs
Setting up an e-commerce website in Turkey does not end with the software: return terms, pre-contract information, shipping and paperwork must be ready too. A six-part checklist of what you need and which cost items to plan for.
November 9, 2026 · 8 min read