Data migration from an old system to a new one: data cleansing, mapping and validation
How do you migrate data from an old system to a new one? Source inventory, data cleansing, field mapping, a trial import and cutover day, step by step.
Migrating data from an old system to a new one means moving records through a source inventory, cleansing, field mapping, a trial import and validation; it is also called data migration. First decide what will be moved, then clean the data and map the fields, validate the result with a small trial, and do the final transfer on cutover day. Bulk import from Excel is the most common form of this process.
On the first day in the new system, the physical count does not match the number of records in the system. In the old Excel list, the same computer appears on two rows and another one is missing entirely; a device shown as “assigned” is still recorded under the name of an employee who left years ago. Nobody damaged the list on purpose; over the years, everyone added rows in their own way. If data is migrated from the old system to the new one with the list as it is, the same mess continues on a new screen, however good the new system is. The success of a data migration is decided less by the moment of transfer than by the preparation before it.
Migrating data from an old system to a new one means moving records from one system to another through a source inventory, cleansing, field mapping, a trial import and validation; it is also known as data migration. The source can be an Excel file, an old program or paper records. The job is not to copy data but to bring it in line with the new system’s rules and validate it.
How is data migration done? Six stages
- Source inventory: Where does the data live? Which is the master list, who updates it, and in which files or programs are there copies? Decide at this stage what will not be moved, too.
- Cleansing rules: Set written rules for duplicates, spelling variations, missing fields and outdated records.
- Field mapping: Write down in a single table which field in the new system each column in the old system corresponds to.
- Trial import: First try a small set of records, ideally without touching the live data, and review the results.
- Validation: Compare counts, sample records and critical fields with the source.
- Cutover day: Freeze changes in the old system, do the final transfer and declare the new system the single source of truth.
What should you not migrate?
Not every record needs to go to the new system. Records closed years ago that are not involved in any transaction can stay in the archive; the new system starts with only active, useful data. Not moving personal data that is not needed also reduces data volume and keeps the scope of access permissions simple. For records that are hard to decide on, open an “undecided” list and ask their owner before migrating.
Who does what in the migration?
Migration should not be one person’s job. The person who knows the data, that is, the warehouse, administration or HR lead, sets the cleansing rules and approves the result. The person who knows the system builds the mapping and performs the transfer. Someone from management approves the cutover day and what will not be moved. If these three roles are named at the start, the question “who owns the data?” is answered at the beginning of the project, not when a problem arises.
How do you cleanse data? Common problems in Excel
You can only cleanse data once you know what is broken. Below are the most common problems in an asset list and rules you can set for them; find the problems in your own list and put the rules in writing.
| Problem | Example | Cleansing rule |
|---|---|---|
| Same record twice | A device with the same serial number on two rows | Deduplicate by serial number; merge differing fields by hand |
| Spelling variation | “Notebook”, “Laptop”, “NB” for the same device type | Define a type list; convert every value to its equivalent on the list |
| Empty critical field | Serial number or location empty | Define mandatory fields; complete empty ones through a physical count or move them to a separate list |
| Status typed as text | “In use”, “Ahmet has it”, “broken, I think” | Reduce statuses to a limited list; move the typed text to a notes field |
| Name variations | The same employee spelled three different ways | Use the staff list as the reference; correct names against it |
| Outdated assignment | A device shown as assigned to someone who has left | Compare with the active staff list; confirm the return and update the record |
| Date format | Text in some cells, dates in others | Choose one format; convert text entries to dates |
Field mapping: which column goes where?
The mapping table is like the contract of the migration: source column, target field, required transformation and what to do if the value is empty are written in one place. A fictional example for the Asset & Assignment Management module could look like this:
| Excel column | Field in the new system | Transformation | What if it is empty? |
|---|---|---|---|
| Inventory no. | Assignment number | Must be unique for each asset; duplicates are resolved beforehand | Record is not imported and goes on a list |
| Device name and type | Inventory card details | Converted to its equivalent on the type list | Type is marked “undecided” and completed later |
| Serial number, barcode | Inventory card and barcode details | Spaces and upper/lower case differences are corrected | Flagged to be completed during the count |
| User | Assigned employee or location | Matched to the record in the staff list | Asset is treated as “Idle” and checked |
| Status | Idle, Assigned, In Repair, Faulty, Scrapped, Lost | Typed-in text is converted to one of these six statuses | Goes on the review list |
Trial import and validation: what do you check?
A trial import lets you run into surprises before cutover day rather than on it. Instead of importing everything, import a sample containing different kinds of records: rows with empty fields, long text, duplicates and special characters. If the result differs from what you expected, fix the rule and run the trial again. If the person validating is different from the person importing, oversights are easier to catch.
- Does the total record count in the source and the target match, together with the list of records not imported?
- Are all fields of randomly selected records the same on both sides?
- Are numbers that must be unique really unique?
- Have any critical fields (owner, location, status) arrived empty?
- Are characters corrupted; do Turkish characters and special symbols display correctly?
- Who will correct faulty records, and through which channel?
- Has someone who knows the results, that is, the warehouse or administration lead who did the count, looked at the screens?
Cutover day: how is the final transfer done?
Cutover day is the day the old system is left behind and the new system becomes the single source of truth. What matters here is that no last change in the old system slips through. This sequence works well: first freeze changes in the old system and announce it to everyone; then take the final export; load it into the new system, applying the rules you fixed during the trial import; and repeat the count and sample checks. Do not delete the old system; keep it as a read-only archive so you can look back if doubts arise.
When is bulk importing Excel data into a new system reliable, and when is it risky?
Bulk import from Excel is very practical when the data volume is moderate and the list has been cleaned by a responsible person; entering records one by one by hand is both slow and error-prone. The risk lies in Excel’s accept-anything nature: a column can contain both dates and text, spaces are invisible, and a spelling difference in one cell becomes a separate value in the new system. So apply the cleansing rules before the bulk import and compare with the source afterwards.
How do you move an asset list into YazSis KurumsalPortal?
The Asset & Assignment Management module includes bulk import from Excel: your existing asset list can be brought into the module without entering records one by one. Each asset is identified by a unique assignment number and tracked through the statuses Idle, Assigned, In Repair, Faulty, Scrapped and Lost; assignment, return, transfer, fault and repair movements accumulate on the asset’s card. Because records can later be exported as an XLSX report, an up-to-date list can be used for counts and audits.
Automatic data transfer from an ERP or another program, however, is a separate integration project. Which data is moved, and how, is agreed during the needs analysis as part of the project scope; we do not promise automatic ERP transfer in this article. If you need to plan the migration more broadly than a one-off Excel import, see the System Integration page; to move your inventory, see the Asset & Assignment Management page.
Frequently asked questions
What is data migration?
Data migration is moving data from one system to another. It includes getting to know the source, cleansing it, mapping fields, a trial import and validation; it is not just a copying job.
What should you do before importing Excel data into an ERP or a new system?
Remove duplicate records, convert spelling variations to a single list, complete mandatory fields and write down in a mapping table which field in the new system each column goes to. Then compare the result of a small trial with the source.
How do you cleanse data?
First identify what problems exist: duplicates, spelling variations, missing fields, outdated records. Set a written rule for each problem and apply the same rule to all records. Because one-off manual corrections are not repeatable, keep a separate list for records that fall outside the rules.
When is the old system shut down when moving to a new one?
Once the new system has been validated and the final transfer on cutover day is complete, the old system is closed to changes. Keeping it as a read-only archive instead of deleting it gives you something to refer to when questions come up later.
Can I import my existing asset list into KurumsalPortal?
Yes. YazSis KurumsalPortal includes bulk import from Excel; your existing asset list can be brought into the Asset & Assignment Management module without entering records one by one. Records can later be exported as an XLSX report.
More articles
How to plan parent introductory meetings at a private school: an admissions calendar
A parent introductory meeting is an appointment where a family considering enrolment tours the school and asks its questions. When the host, the route and the duration sit in one calendar, the admissions season runs more calmly.
November 24, 2026 · 6 min readWhat is the WhatsApp Business API? How it differs from the app and when you need it
Customers writing to one number, three people sharing a phone, and messages that get lost. We explain what the WhatsApp Business API is, how it differs from the app, how pricing works and when you actually need it.
November 24, 2026 · 8 min readHow to prevent recurring nonconformities: root cause and corrective action steps
A finding closed in March came back on a different shelf in September. Using a fictional audit year, we explain correction versus corrective action, root cause analysis and effectiveness checks to stop nonconformities from recurring.
November 24, 2026 · 8 min read